Our Solutions
Inbound to Manufacturing
- Port-to-port ocean transport for full-container and less-than-container loads
- Door-to-door via Air Freight
- Port-to-door road transport for full-truck and less-than-truck loads
- Port-to-door intermodal transport
10x
Increase in Installed wind capacity required by 2050 to achieve net-zero
80%
Of the world’s offshore wind resource potential lies in waters deeper than 60m
Manufacturing
- Warehousing for parts storage
- Bonded storage for parts
Site Delivery
- Large component delivery for Out of Gauge cargo via ocean and road
- Parts distribution via ocean and road for full and less than full loads
- Same-day tool deliveries
- TEQ returns for full loads
120.7GW
Of new wind capacity was installed in 2023 – a record!